Santander Bridge

And here it is, from my previous post, here is the ad I have been working over xmas at The Mill, since the start of December.
I was on the job from the start (which is always favourable) and as such did a variety of things. I spent a bit of time building the bridge through some scripts that I wrote.
These scripts duplicated nulls along the main curve of the bridge with the correct spacing so we could place particles (ICE) instanced objects (the bricks..) on those nulls. Also some lighting and rendering and scene setup and what not! The usual.
Also I was working with my old pal from uni Aidan Gibbons (we made Diversion together at uni)